Jackson Airport – Apron Reconstruction Schedule ll
Work included the removal of existing concrete & asphalt pavement, roto-milling asphalt, demolition of existing trench drain and RCP storm drain, Portland Cement concrete paving (13-inch) 9,765 SY, Portland Cement concrete paving (8-inch) 3,922 SY, bituminous paving 105 tons, aggregate base course 2,655 CY, unclassified excavation 610 CY, storm drain pipe installation (Ductile Iron) 385 LF, installation of precast manhole with oil stop, 12-inch modular trench drain 308 LF, airfield lighting, including new duct banks and pavement marking improvements.
